Qudra Road 132/33kV Substation
Client Name: DEWA

Sector
Commercial

Location
Al Waha

System Size
1 MWp

Contract Period
5 Years

Annual Energy Production
3GWh/Year

CO² Reduced Emission
2.105 Metric Tons
Qudra Road 132/33kV Substation is a major electrical power substation located in Dubai, UAE. It is a project commissioned by the Dubai Electricity and Water Authority (DEWA) for which tenders for its construction were issued in the past. The substation’s role is to handle high-voltage electricity, stepping it down from 132kV to 33kV for further distribution to meet the growing demand for power in the area.
A 132/33kV substation like the one on Qudra Road performs the critical function of reducing high-voltage electricity from a main transmission line to a lower voltage suitable for a specific local area. From the substation, the power is then distributed through a network of smaller lines to homes, businesses, and other facilities.








